The beams arrived on the 24th February, literally hours before the arrival of the work team. The large beams are the 12" x 12" ones that will replace those in the damaged sections in the perimiter of the building.
 |
Container with Beams outside the Churchyard wall |
 |
Beams inside container |
Getting the beams into the churchyard required the use of a crane.